Stabilizing Construction Entrance
Stabilizing Construction Entrance
Construction entrances are stabilized to reduce the amount of sediment transported onto paved roads, by vehicles or equipment, by constructing a stabilized pad of quarry spalls at entrances to sites.

- Construction entrances shall be stabilized wherever traffic will be leaving a construction site and traveling on paved roads or other paved areas within 1000 feet of the site.
- Use and maintain gravel construction entrances where truck traffic is frequent. This will reduce soil compaction and limit tracking of sediment onto streets.
Limitations
- The entrance is only as good as the materials used to construct it.
- Must use clean pit run for single driveway.
Maintenance Requirements
- If the entrance is not preventing sediment from being tracked onto pavement, then alternative measures to keep the streets free of sediment shall be used.
- Any sediment that is tracked onto pavement shall be removed by shoveling, scraping or street sweeping. Sediment collected by sweeping shall be removed and stored onsite.
- Any quarry spalls that are loosened from the pad, which end up on the roadway, shall be removed immediately.
- Upon project completion and site stabilization, all construction accesses intended as permanent access for maintenance shall be permanently stabilized.
Storm Water Management Manual for Western Washington, BMP Reference (2005):
Available at: http://www.ecy.wa.gov/programs/wq/stormwater/index.html
- Stabilizing Construction Entrance – BMP C105, Volume II, Construction Stormwater Pollution Prevention